Skip to content
Browse guides

How do contests load and test a bridge?

Common loading setups: a hook or eyebolt at mid-span, a loading block or plate, buckets of sand, and what to check so your bridge works on the test rig.

Updated · 1 min read

Short answer: most hang a weight from the middle of the bridge, through a hook, an eyebolt or a loading plate, and add weight until the bridge fails or a cap is reached. The details vary, and they can decide your design.

Common setups

  • Hook or eyebolt through the deck. The bridge needs an opening or attachment point at the load position.
  • Loading block or plate. A small block sits on or under the bridge, with a rod through it, and the load hangs from the rod. Rules limit the block's size.
  • Platform or roadway on top. The load rests on a deck or platform you provide.
  • Bucket of sand or weights, added in steps, or a hydraulic or screw rig that pushes or pulls.
  • Supports. Two stands or blocks set the span. The bridge may rest on top or hang between them.

What to check

  1. Where the load goes, and how the bridge must connect to it.
  2. Whether the bridge must leave a gap or opening for the rod, a plate or a car.
  3. How the supports hold the bridge. Does it simply rest, or may it be fixed?
  4. What counts as failure: breaking, bending a set distance, or touching the floor.

Match your practice rig to these details. See testing safely and reading your rulebook.