Skip to content
Browse guides

How do bridge contests score entries?

Efficiency, load only, specific strength, longest span, lowest mass: the scoring systems student bridge contests use and what each means for your design.

Updated · 1 min read

Short answer: most rank by load held divided by the bridge's own mass, but some rank by load alone, by the longest span, or by the lightest bridge that reaches a set load. Read the scoring section first, because it changes what you should build.

Common systems

ScoringWhat winsWhat to build
Efficiency (load ÷ mass)Best ratioLight and strong
Specific strength (maximum load ÷ own weight)The same idea under another nameLight and strong
Load onlyHighest loadAs strong as the mass limit allows
Load cap, then lowest massLightest bridge that reaches the capJust strong enough, very light
Longest spanGreatest gap crossedA design that stretches, often with supplied sticks
Time or tie-breaksFastest build, or smallest mass, when scores tiePractice a repeatable build

Other things that can count

  • A design report, an interview or a prediction of the failure load.
  • Penalties for breaking a rule, such as being over the mass limit or leaving too little clear space.
  • A minimum load the bridge must hold at all, before it is ranked.

Why it matters

A bridge built for efficiency is the wrong bridge for a load-only contest, and the other way round. Decide which kind of contest you are in, then design for that. See the efficiency score and what specific strength means.